/

Questions

/

Assignment

/

Calculate the work done if the force increases from 100N to 700N using: Take the number of cut sections to be 5: BTEC Engineering Assignment, QUB, UK

Looking For Plagiarism Free Answers For Your UK College/ University Assignments.

BUY NOW

Calculate the work done if the force increases from 100N to 700N using: Take the number of cut sections to be 5: BTEC Engineering Assignment, QUB, UK

UniversityQueen's University Belfast (QUB)
SubjectBTEC Engineering

Task 1

  • Calculate the work done if the force increases from 100N to 700N using: Take the number of cut sections to be 5.
    i) An analytical integration technique
    ii) A numerical integration technique
  • Compare the two answers
  • Using a computer spreadsheet increase the number of values used for your numerical method
  • Analyze any effect the size of the numerical step has on the result.

Task 2

  • Find the indefinite integral of the function

BTEC Engineering

  • Calculate the definite integral

BTEC Engineering

Task 3

An object is moving with a uniform acceleration a = 3ms‾², determine the functions for:

  • Velocity (ms‾¹) – given v(0) = 12ms‾¹
  • Displacement s(m) – given s(0) = 7m
  • Calculate the values of v and s for:
    i) t = 3s
    ii) t =7s

Do You Need Assignment of This Question

Get help by expert

Excel in BTEC Engineering with the trusted assignment writing help provided by Diploma Assignment Help UK. Our dedicated team of experts is committed to delivering comprehensive report writing help tailored to your academic needs. From analyzing engineering principles to solving complex problems, our reliable support will empower you to excel in your assignments.

Recent solved questions

sample image
Hire An Assignment Writer