- Unit 7 Leadership & Management People Assignment – Level 3 Diploma in Business and Management
- HNC Civil Engineering Assignment 2 The Construction Environment
- HNC Civil Engineering Assignment 1 Geotechnics & Soil Mechanics Academic Year 24/25
- UNIT CMI 519 Managing Quality and Continuous Improvement Assessment Brief
- Level 5 in Leadership and Management in Adult Care – Governance and Regulatory Process in Adult Care and Decision Making in Adult Care
- BTM6GSM Global Strategic Management Level 6 Assignment 1 Case Study
- Level 5 in Leadership and Management in Adult Care – Supervising Others and Facilitate Coaching and Mentoring of Practitioners in Care Settings
- Unit 2 Marketing Processes and Planning Assignment Brief 2025-2026
- Unit 805 Strategic Communication Assignment Brief- Media Impact on International Organisations
- UNIT CMI 513 Managing Projects to Achieve Results Assessment Brief
- AFM5CGL Level 5 Corporate Governance and leadership Assignment Case Study
- Law, Policy and Ethical Practice in Health and Social Care Assignment 2025-2026
- BTEC International Level 3 in Business Pearson Set Assignment – Unit 7 Business Decision Making
- Unit 7 Budget Assignment: Effective Financial Planning, Budgetary Control, and Stakeholder Management in Dental Practice
- Level 2 NVQ Diploma in Specialist Concrete Occupations Assignment: Knowledge and Understanding of Health, Safety, Work Practices, and Concrete Application
- Level 4 SPS4064 Physiology of Exercise Assignment: Comprehensive Assessment Through MCQs and an In-Depth Marathon Running Case Study
- Communication Management Assignment: Monitoring, Evaluating, and Improving Workplace Communication Systems
- Unit 806 Culture and its Impact on Strategy Assignment: A Critical Evaluation of International Organisational Policy, Decision-Making & Stakeholder Dynamics
- CMI Unit 601 Professional Management and Leadership Practice Assignment – The Influence of Organisational Context on Management and Leadership
- ILM L 7 unit 700 Assignment : Understanding the Principles and Practice of Effective Coaching and Mentoring at an Executive or Senior Level
Your supervisor, Dr. A. Nick, has been contacted by a commercial entity that is interested in constructing a new and exclusive: Civil Engineering Assignment, UOB, UK
| University | University of Bath (UOB) |
| Subject | Civil Engineering |
Your supervisor, Dr. A. Nick, has been contacted by a commercial entity that is interested in constructing a new and exclusive leisure resort in the French Alps. The developer has identified a number of potential sites for their resort but is concerned about the potential for avalanches in the region.
In order to determine the most suitable location for the planned resort the developer has requested that your supervisor’s team conduct modeling to enable the company to better predict the run-out distance for avalanches in each of the sites they are investigating. Dr. A. Nick has suggested you should investigate this problem using a model experiment.
A schematic of the apparatus available to conduct the model experiment is shown in figure 1. In summary, the apparatus consists of a ramp in which a straight chute is connected seamlessly to a horizontal sheet by a smooth curve. At the start of a test, a quantity of granular material is held behind a trapdoor at the top of the chute.
Do You Need Assignment of This Question
To initiate a test the trapdoor rotates about a hinge thereby releasing the granular material to travel down the ramp. The distance that the granular material travels beyond the bottom of the ramp is known as the run-out distance x, as shown in figure 1. The horizontal sheet at the base of the ramp is marked with a graduated scale to facilitate the measurement of x.
The apparatus is designed in such a way that its geometry can be extensively varied. In particular, it is possible to vary the length of the chute L (0.1 ≤ L ≤ 2 m), the width of the chute W (0.05 ≤ W ≤ 0.5 m), and the angle θ (10 ≤ θ ≤ 60) at which the chute is inclined. The trapdoor is of a fixed width Wtrap = 0.05 m and freely rotates about the hinge when a latch fixing the trapdoor in position is removed. The radius R of the curved section of the ramp cannot be varied.
Buy Answer of This Assessment & Raise Your Grades
Looking for reliable Civil Engineering assignment help ? Diploma Assignment Help UK is your trusted solution. Our experienced team of writers delivers high-quality and accurate solutions to help you excel in your academic journey. so stop wasting your time and get the best engineering assignment help in uk


