AE6005 Apply with Aircraft Maintenance Report 2 2026: Planning Report for a 10-Year A320 Base Maintenance Solution (Kingston University)

DA

Diploma Assignment Help UK Editorial Team

Subject Expert

8 min read
November 06, 2026
University Kingston University(KU)
Subject AE6005 Apply with Aircraft Maintenance

AE6005 Apply with Aircraft Maintenance Report 2 2026: Project Planning Report for a 10-Year A320 Base Maintenance Solution (Kingston University)

University Kingston University
Module AE6005 Apply with Aircraft Maintenance
Assessment Report 2: Apply project management tools to a maintenance-related business model (summative)
Weighting 50% of the module
Group output One planning report of 2,000 words, uploaded by the designated Project Manager
Individual output A 300-word self-reflection report plus a digital logbook of journal entries
Submission December 2026, 23:59; feedback released 12 January 2027
Referencing Harvard

This AE6005 report asks student groups to plan a 10-year base-maintenance solution for an Airbus A320 fleet using the operator scenario on Canvas (an AMO operator information workbook is provided). The focus is on project planning: decomposing the work into tasks, scheduling it, and setting out communication and risk management. Individual marks are weighted using each student’s self-reflection and logbook.

Purpose of the Assessment

Prepare a planning report that proposes a 10-year base-maintenance solution for the scenario provided on Canvas. The planning report should identify the tasks required to:

  • Determine the aircraft’s maintenance requirements for the Airbus A320 fleet provided.
  • Evaluate the available maintenance options.
  • Assess the facilities, equipment, personnel and other resources available at the hubs, bases and destination airports.
  • Consider a range of maintenance strategies, including in-house provision, outsourcing and combinations of both.

Planning Report Content

  • A draft introduction for the final project report, including a scenario that sets the scene and explains why the project is being done, a statement of the project aim(s) and a statement of the project objectives.
  • The tabulated task list produced during the planning process.
  • An activity-on-node network diagram or a Gantt chart with clear task allocation.
  • A communication plan.
  • A risk register.

Individual Submission

Every student submits a 300-word self-reflection report that explicitly outlines their personal contribution to the group planning report, together with a digital logbook containing enough journal entries to evidence the level and nature of their contribution.

Learning Outcomes

  • Understand the project planning process and be able to decompose a project and produce a comprehensive plan for its completion (AHEP4 B1, B4, B9, B10).
  • Work effectively as a team member and as an individual to achieve given goals in fixed timeframes, and work independently on self-improvement (B16, B18).

Marking Criteria

Criterion Marks AHEP4
Introduction, aim(s), objectives and deliverables 20 B1
Task list and Gantt chart / network diagram 40 B1, B4
Communication plan 10 B16
Risk register 15 B9, B10
Summary 5 B18
Readability (coherence, headings, schematics and diagrams/flowcharts) 10 –
Total 100%

First-class work presents a logically sequenced, justified task list and a schedule that accurately shows dependencies, durations, milestones and responsibilities, a practical communication plan covering stakeholders, methods, frequency and outputs, and a risk register with realistic likelihood and impact ratings, owners, triggers and contingency responses. A word count must be stated, and mitigating circumstances and academic integrity guidance is on MyKingston.

Need help with your AE6005 A320 maintenance planning report?

Forty of the 100 marks sit in the task list and schedule, so build the work breakdown first: maintenance programme review for the A320 fleet (A-checks, C-checks, heavy checks over 10 years), option appraisal of in-house versus outsourced base maintenance, a resource survey of hangars, tooling and licensed engineers at each hub, and the decision and implementation phases. Give every task an owner, duration and predecessor so the network diagram or Gantt chart shows the critical path, then make the risk register specific to aviation (slot availability, Part-145 approval, parts lead times, staff licensing). Our engineering assignment help in the UK and project report writing help can guide your planning tools and Harvard referencing. You can also compare the AE6005 landing gear network analysis brief from the same module.

Answer
AI-Free Assignment Help - Get free Quote
Tell us about your task

Step 1 of 2 · No payment needed to get a quote

Not sure how to fill in this form? Message us on WhatsApp and we will guide you through each field.
Ask on WhatsApp

Need Help With This Question?

Our expert writers can provide a complete, plagiarism-free solution tailored to your requirements.

WhatsApp us