/

Questions

/

Assignment

/

ME5620: The Wilts and Berks Canal Trust was formed in 1977 to bring the canal back into use for recreational boat users: Renewable Energy Systems for the Built Environment Assignment, BUL, UK

Looking For Plagiarism Free Answers For Your UK College/ University Assignments.

BUY NOW

ME5620: The Wilts and Berks Canal Trust was formed in 1977 to bring the canal back into use for recreational boat users: Renewable Energy Systems for the Built Environment Assignment, BUL, UK

UniversityBrunel University London (BUL)
SubjectME5620: Renewable Energy

The Wilts and Berks Canal Trust was formed in 1977 to bring the canal back into use for recreational boat users with access to walkers and cyclists. That task is enormous because the canal has been disused since 1914. The canal opened in 1810, running 52 miles from the Thames near Abingdon to the Kennet and Avon Canal near Melksham.

It passes through the outskirts of Swindon which has grown immensely since 1810. Much of the original route has been overbuilt but the increase in population in the area has increased the demand for amenity space and many new developments have protected the proposed route changes and even helped to restore parts of the canal.

 

Do You Need Assignment of This Question

 

WBCT has taken over one Public House on the route that will become a Visitor Centre. But other Visitor Centres will be needed near to centres of population to meet the needs of local people and visitors to the area. By creating these centres, the public will become more aware of the canal and it will generate much-needed revenue. As climate change is a major concern, the new buildings must be at the forefront of sustainable design and operation.

One area that has been selected as a popular location is ‘Templar’s Firs’ on the outskirts of Royal Wootton Bassett, about 6 miles from Swindon. There is a redundant council refuse depot which could be a suitable site and a preliminary design is needed to progress planning for a possible Visitor Centre.

The outline design for the new building is shown in a separate document together with details of its construction. You are required to carry out a detailed assessment of the potential for building fabric energy efficiency, building services and low carbon/renewable energy technology for the proposed new building. This will involve producing a client report in two stages.

 

Buy Answer of This Assessment & Raise Your Grades

 

Get help by expert

Looking for reliable assignment writing help in the UK? You’re in luck! Our expert team is here to provide top-notch assistance for your academic journey at Oakland University (OU). Whether you need Business Assignment Help or assistance in any other subject, our dedicated writers are ready to deliver high-quality solutions. We understand the significance of renewable energy systems for the built environment, and our online assignment help UK services are tailored to meet your specific needs. Pay our experts and excel in your course. Trust us for professional assistance with your Renewable Energy Systems for the Built Environment Assignment at OU. Join us in shaping a sustainable future

Recent solved questions

sample image
Hire An Assignment Writer